
- 400+Projects
- Engineers on site
What a deployment includes
Six things, each owned by the engineer who designed the network.
Staging & configuration
Every switch, gateway and AP configured, updated and labeled in our lab before it ships. Nothing is configured for the first time on your floor.
Rack & stack
MDF and IDF builds to the design: rails, cable management, power and labeling, photographed before we leave the room.
Cabling oversight
Our engineers scope and inspect the structured cabling (Cat6A, fiber, terminations and test results), whether we pull it or your contractor does.
Cutover
A rehearsed plan with a rollback path, run in a window you choose. The legacy network stays live until the new one proves itself.
Validation
Every port, VLAN, SSID and uplink tested against the design, with throughput and failover measured.
Handoff & documentation
As-built diagrams, port maps and credentials in your vault, with a walkthrough for your team. You run it from day one.
Our process
Stage, install, cut over, hand off.
- 01
Stage
Configuration, firmware and labels done in our lab. Each device ships tested and tagged to its rack position.
- 02
Install
Racks built to the design, cabling inspected and certified, power and uplinks verified before anything goes live.
- 03
Cut over
A rehearsed window with a rollback path. Legacy stays up until every VLAN, SSID and uplink is proven on the new network.
- 04
Hand off
As-builts, port maps and credentials handed to your team with a walkthrough. Support continues through TAC.
